allPage 1Shapearrow-shotCombined Shape Copybadgenoun_1359559_ccPage 1Combined ShapeGroup 13Page 1Group 11GroupPage 1Page 1ShapeShapeGroup 9Fill 5Group 2Page-1Page 1Page 1Group 26Group 9linkedinShapePage 1 Copy 2man-inputman-outputGroup 17ShapeGroup 11Page 1ShapePage 1ShapeplayPage 1Page 1ShaperocketOrion_searchPage 1Group 11Page 150Icon_5px_gridpictoFill 3userGroup 10Group 10

Join BESIX in co-creating sustainable innovation

Success story
BESIX conquest the sky

The Burj Khalifa in Dubai

In the centre of Dubai stands the Burj Khalifa tower, the world’s tallest manmade structure. This impressive skyscraper reaches up to a record height of 828 !

New Standards Require Advanced Technologies

The latest advanced technologies in wind engineering, structural engineering, structural systems, construction materials and methods were applied in order to build the tower.

The materials were subjected to wind tunnel tests at hurricane speed (200 km/h) to make sure they would withstand all conditions. Flexible tubes and joints were used to enable some sway.

The two most important challenges to achieve this project within the required target were the logistic organization of the vertical transport (materials, workers and waste evacuation) to achieve a construction cycle up to two floors per week and the pumping up of the concrete to the highest level possible (a world record of 585 m). In order to cope with the problem of placing concrete in high temperature conditions (up to more than 45°C), special concrete mixtures were developed and poured mainly during the night.

Tower Of Records

The Burj Khalifa is the tallest building in the world according to the three main criteria of the Council on Tall Buildings and Urban Habitat (CTBUH): ‘Height to Architectural Top’, ‘Height to Highest Occupied Floor’ (at 550 m) and ‘Height to Tip’.

Other world records for the Burj Khalifa include the highest residential floor (550m), the highest outdoor observation deck in the world, at the Top on Level 124 and the tallest service elevator, which travels to a height of 504 m. At the peak of the construction works in 2009, more than 12,000 workers and staff were on site every day. Six Construct was the first contractor to pump up concrete to a height of 585 m.